Assembly, control cabinet building, relocation and decommissioning for line builders, special-purpose machine builders and production plants – in detail.
01
Production line assembly
We assemble production lines to your assembly and layout drawings – at pre-assembly in the line builder's hall as well as at final assembly in the end customer's plant. Mechanical, pneumatic and electrical work is carried out by a single team.
- Set-up and alignment of machines, conveyors, safety fences and platforms
- Anchoring, setting-out and levelling with a level instrument and machine spirit level
- Assembly of gantries, robots and peripherals
- Pneumatics: tubing, valve manifolds and populated mounting plates
- Cable routes and wiring to EPLAN, cable assembly, connection of motors, peripherals and control cabinet
- Network cabling and network testing
- Consistent labelling of all cables and components
- Markup of changes and corrections in the drawings (EPLAN)
- Electrical testing to DIN EN 60204-1 and DIN VDE 0100-600 with test report
02
Control cabinet building
We build control cabinets to your plans – based on your wiring diagram (EPLAN or PDF) and using your material. Manufacturing takes place in Slovakia or directly in your hall.
- Populating the mounting plate
- Machining of enclosure and mounting plate to plan: drilling, cable ducts, mounting rails
- Wiring to the wiring diagram
- Labelling and marking
- Testing with test report
- Documentation of deviations in the wiring diagram
- Shipping-ready packaging
- On request: connection on site by the same team
03
Dismantling and relocation
Whether a line after testing at the manufacturer or a relocation to a new site: we dismantle machines and lines in an orderly and traceable way. Especially with older, repeatedly modified equipment, careful documentation is the prerequisite for flawless reassembly.
- Survey before dismantling: photo documentation, measurements and height survey – including existing damage
- Marking of all assemblies, cables and connections
- Mechanical, pneumatic and electrical dismantling
- Packing, palletising and loading onto trucks
- Moving machines within the hall with jacks and heavy-duty rollers
- Reassembly and electrical testing at the new site
- In Europe and worldwide
04
Decommissioning and hall clearance
Machines and equipment that are no longer needed are dismantled in an orderly manner and prepared for scrapping – including in heavily soiled or oil-contaminated areas.
- Dismantling of machines and lines
- Clearing of production floor space
- Preparation for scrapping
- Work on heavily soiled and oily equipment
05
Modifications and rework
Production lines change: new product variants, additional stations, altered processes. We carry out modifications, extensions and rework on new and existing equipment – mechanical, pneumatic and electrical.
- Modification and extension of existing lines
- Rework after assembly
- Adaptation of mechanics, tubing and cabling
- Documentation of changes in the drawings
- Short-notice assignments, including on equipment we built ourselves
06
Site supervision and documentation
Every JMS team works under its own site supervisor. The supervisor coordinates the work on site, liaises with your project management and is your fixed point of contact – in German or English.
- Coordination of the team on site
- Liaison with your project management
- Timesheets in an agreed format
- Assembly reports on the progress of work
- Compliance with your plant's safety requirements
07
Let's talk about your project.
Briefly describe scope, location and timeframe – we will get back to you promptly with a proposal.